|
|
|
|
|
|
Cost per Foot Proposal |
Standard Day Rate Proposal |
Special Proposal |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
Surface Location
|
Bottom Hole Location
|
| X - Y Coord. |
Lat - Long Coord. |
Legals |
X - Y Coord. |
Lat - Long Coord. |
Legals |
|
|
|
|
|
|
|
| |
| Well Type: |
|
|
| |
| Target Specifications: |
Surface Plat is Required and Offset Data Requested, If Available.
Enter RKB or Subsea TVD for each target and PBHL. Indicate target shape and orientation if know.
|
| |
|
|
Target Name
|
RKB-TVD
|
(SS TVD)
|
+North/-South
|
+East/-West
|
Target Size
|
Target X-Y Coordinates
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
| Hole Geometry: |
Information Required
|
|
|
|
|
Cost per Foot Time Estimate
Time / Days vs Depth Plot
Page Plot and Page Plan
Wall Plot (Surface Plot Required)
BHA / Motor Recommendations
Hydraulics
Bit Optimization / Recommendations
Anti-Collision Analysis / Spider Plots
|
|
Comments:
|
| |
| Hydraulics Input Information |
| |
Hole #1
|
Hole #2
|
Hole #3
|
Hole #4
|
Hole #5
|
Hole #6
|
| Hole Size |
|
|
|
|
|
|
| Mud Type |
|
|
|
|
|
|
| MW |
|
|
|
|
|
|
| PV |
|
|
|
|
|
|
| YP |
|
|
|
|
|
|
| MWD Type |
|
|
|
|
|
|
| Flow Rate |
|
|
|
|
|
|
| |
| Drillstring Input Information |
| |
DP #1 Size: |
|
HWDP #1 Size: |
|
Drill Collar #1: |
|
| |
Grade (E,G,S) |
|
Conn. Type: |
|
Conn. Type: |
|
| |
Conn. Type: |
|
|
|
|
|
| |
DP #2 Size: |
|
HWDP #2 Size: |
|
Drill Collar #2: |
|
| |
Grade (E,G,S) |
|
Conn. Type: |
|
Conn. Type: |
|
| |
Conn. Type: |
|
|
|
|
|
| |
| Rig Contact Information: |
| |
Contractor: |
|
Rig No. |
|
|
| |
Contact: |
|
Contact No. |
|
|
| |
| Pumps: |
| |
|
|
| |
|
|
|
| |
| Special Instructions: |
| Provide client desires with respect to Hard Lines, Desired Build Rate, Maximum Dog Leg, Maximum Angle Comments, Requests, etc. Also any offset data: average days by competitors, performance data, Avg. ROP, bit type etc. In order to prepare Spider Plots and Anti-Collision Analysis; all Offset Well surveys, with Survey Instrument used, Slot Diagrams and Well Head locations must be provided before Spider plots can be provided. |
|
|
| Intrepid will not be held liable for well plan changes or deviations that are not documented from the client. |
|
|
|